AL-118 over Branch

1.4 mile E of Beaverton · County 075, Alabama · Built 1926 · 2 Lanes · 2,283 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
014326
Year Built
1926
Reconstructed
1988
Length
9.8 m (32.2 ft)
Max Span
3 m
Lanes
2
Daily Traffic
2,283
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$408,000
Total Project Cost
$449,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.