SR 25 over DRY CREEK

3.8 MI. N. OF THOMASTON · County 091, Alabama · Built 1987 · 2 Lanes · 1,110 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
014227
Year Built
1987
Length
82.9 m (272 ft)
Max Span
10.4 m
Width
12.7 m (41.7 ft)
Lanes
2
Daily Traffic
1,110
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,611,000
Total Project Cost
$2,872,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.