HATLEY DETROIT RD over SIPSEY CREEK RELIEF

2.2 MI. S.W. DETROIT · County 075, Alabama · Built 1987 · 2 Lanes · 380 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
014180
Year Built
1987
Length
51.8 m (169.9 ft)
Max Span
10.4 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
380
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,148,000
Total Project Cost
$1,263,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.