CR-9 over YELLOW CREEK

6.1 MI. S.W. VERNON · County 075, Alabama · Built 1987 · 2 Lanes · 510 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
014179
Year Built
1987
Length
124.4 m (408.1 ft)
Max Span
10.4 m
Width
8.3 m (27.2 ft)
Lanes
2
Daily Traffic
510
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,458,000
Total Project Cost
$2,704,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.