AL-102 over Sipsey River

2.0 MI E JCT US-43 · County 057, Alabama · Built 1986 · 2 Lanes · 1,882 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013989
Year Built
1986
Length
261.8 m (858.9 ft)
Max Span
24.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,882
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,540,000
Total Project Cost
$8,294,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.