AL-17 over AGR Railroad

AGR Railroad Aliceville · County 107, Alabama · Built 1986 · 2 Lanes · 4,360 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
5
Fair

Bridge Details

Structure #
013928
Year Built
1986
Length
58.5 m (191.9 ft)
Max Span
26.2 m
Width
11.5 m (37.7 ft)
Lanes
2
Daily Traffic
4,360
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,748,000
Total Project Cost
$1,923,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.