13TH AVE over US 80

3.8 MI E JCT 431 · County 113, Alabama · Built 1986 · 2 Lanes · 2,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
013897
Year Built
1986
Length
86 m (282.2 ft)
Max Span
27.4 m
Width
14 m (45.9 ft)
Lanes
2
Daily Traffic
2,500
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,958,000
Total Project Cost
$3,254,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.