CALLOWAY ROAD over J.R.HARPER BRANCH

3.1 MI S E PAUL · County 035, Alabama · Built 1986 · 1 Lanes · 60 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
013764
Year Built
1986
Reconstructed
2006
Length
13.6 m (44.6 ft)
Max Span
4.3 m
Width
4.9 m (16.1 ft)
Lanes
1
Daily Traffic
60
Material
Wood or Timber
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$223,000
Total Project Cost
$245,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.