CR-11 over I-22

4.7 MP ON I-22/CR-11 · County 093, Alabama · Built 1986 · 2 Lanes · 137 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
013683
Year Built
1986
Length
89 m (292 ft)
Max Span
30.2 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
137
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,031,000
Total Project Cost
$2,234,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.