AL 10 over PIGEON CREEK

6.2 MI E.OF US 31 · County 013, Alabama · Built 1985 · 2 Lanes · 2,663 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
013593
Year Built
1985
Length
187.5 m (615.2 ft)
Max Span
12.5 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
2,663
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$5,583,000
Total Project Cost
$6,141,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.