MEDICAL CENTER DR over AL - 3 (US 31)

US 31 * BROOKWOOD HOSP · County 073, Alabama · Built 1985 · 3 Lanes · 3,800 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
013569
Year Built
1985
Length
59.7 m (195.9 ft)
Max Span
29.3 m
Width
15.5 m (50.9 ft)
Lanes
3
Daily Traffic
3,800
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,453,000
Total Project Cost
$2,698,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.