PELZER AVE over THREE MI BRANCH

250 FT E OF COLISEUM BLVD · County 101, Alabama · Built 1984 · 2 Lanes · 2,500 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
013272
Year Built
1984
Length
20.7 m (67.9 ft)
Max Span
10.4 m
Width
15.2 m (49.9 ft)
Lanes
2
Daily Traffic
2,500
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$974,000
Total Project Cost
$1,071,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.