US 80 over A.G.R

0.8 MI. E. OF DEMOPOLIS · County 091, Alabama · Built 1984 · 2 Lanes · 4,650 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
013243
Year Built
1984
Length
40.5 m (132.9 ft)
Max Span
19.8 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
4,650
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,477,000
Total Project Cost
$1,625,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.