AL-17 over Coal Fire Creek

0.7 MI S Lamar Co Line · County 107, Alabama · Built 1983 · 2 Lanes · 880 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
012992
Year Built
1983
Length
62.2 m (204.1 ft)
Max Span
10.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
880
Material
Prestressed Concrete Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,090,000
Total Project Cost
$2,299,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.