COUNTY ROAD 9 over MOSSY CAMP BRANCH

SEC-30 T-4-N R-25-E · County 045, Alabama · Built 1983 · 2 Lanes · 491 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012964
Year Built
1983
Length
41.5 m (136.2 ft)
Max Span
10.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
491
Material
Prestressed Concrete
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,018,000
Total Project Cost
$1,120,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.