BYNUM EXIT over BRANCH

BYNUM EXIT CULVERT · County 015, Alabama · Built 1982 · 3 Lanes · 4,057 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
012813
Year Built
1982
Length
16.2 m (53.1 ft)
Max Span
3 m
Lanes
3
Daily Traffic
4,057
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$2,009,000
Total Project Cost
$2,210,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.