CO RD 20 over TUBBS CREEK

1.5 MI NW NEW MT HEBRON · County 063, Alabama · Built 1982 · 2 Lanes · 482 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012771
Year Built
1982
Length
29.3 m (96.1 ft)
Max Span
7.6 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
482
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$683,000
Total Project Cost
$751,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.