CO RD 460 over HOLLEY MILL CREEK

5.6 MI SOUTH INO · County 031, Alabama · Built 1981 · 2 Lanes · 329 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
012570
Year Built
1981
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
8.5 m (27.9 ft)
Lanes
2
Daily Traffic
329
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$760,000
Total Project Cost
$836,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.