AL-17 over Tombigbee River

6.0 MI S of Aliceville · County 107, Alabama · Built 1980 · 2 Lanes · 1,524 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
012363
Year Built
1980
Length
605.1 m (1985.2 ft)
Max Span
114.3 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,524
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$17,842,000
Total Project Cost
$19,626,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.