CO RD 400 over MOORES CREEK

2.0 MILES WEST ELBA · County 031, Alabama · Built 1980 · 2 Lanes · 160 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012274
Year Built
1980
Length
40.5 m (132.9 ft)
Max Span
5.8 m
Width
7.7 m (25.3 ft)
Lanes
2
Daily Traffic
160
Material
Concrete
Design
Channel Beam
Owner
City or Municipal Highway Agency
Last Inspected
N/A
Est. Improvement
$859,000
Total Project Cost
$945,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.