US 82 MP 225.315 over COWIKEE CREEK

0.3 MI. W. BARBOUR CO. 79 · County 005, Alabama · Built 1979 · 2 Lanes · 1,690 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
012141
Year Built
1979
Length
96.6 m (316.9 ft)
Max Span
33.8 m
Width
14.4 m (47.2 ft)
Lanes
2
Daily Traffic
1,690
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,418,000
Total Project Cost
$3,760,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.