RIVER ROAD over BLACKBURN FORK OF WARR

3 1/2 MI NE OF HOLLY SPRI · County 009, Alabama · Built 1978 · 1 Lanes · 430 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
012058
Year Built
1978
Reconstructed
2018
Length
18.9 m (62 ft)
Max Span
9.4 m
Width
6.9 m (22.6 ft)
Lanes
1
Daily Traffic
430
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$395,000
Total Project Cost
$435,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.