CO RD 20 over TAYLOR CK

3.0 MI N WATSONIA · County 063, Alabama · Built 1978 · 2 Lanes · 341 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011995
Year Built
1978
Length
62.4 m (204.7 ft)
Max Span
10.4 m
Width
9.1 m (29.9 ft)
Lanes
2
Daily Traffic
341
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,447,000
Total Project Cost
$1,592,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.