F.A.S.05 over AFONEE CREEK

1.3MI SW BIBB CO.1 FAS.05 · County 007, Alabama · Built 1978 · 2 Lanes · 120 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011969
Year Built
1978
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
120
Material
Concrete
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$679,000
Total Project Cost
$747,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.