SR 55 MP 42.715 over PIGEON CREEK

4.4 MI.N.RED LEVEL · County 039, Alabama · Built 1976 · 4 Lanes · 3,800 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011832
Year Built
1976
Reconstructed
1993
Length
142.3 m (466.9 ft)
Max Span
18.3 m
Width
22.7 m (74.5 ft)
Lanes
4
Daily Traffic
3,800
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,624,000
Total Project Cost
$8,386,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.