SR 51 MP 22.399 over CSX R.R.

0.5 MI.S. SR 123 · County 045, Alabama · Built 1976 · 2 Lanes · 2,030 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011828
Year Built
1976
Length
42.7 m (140.1 ft)
Max Span
15.2 m
Width
15.7 m (51.5 ft)
Lanes
2
Daily Traffic
2,030
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,833,000
Total Project Cost
$2,016,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.