CR-39 over Shelton Creek

0.44 Mi NW of CR-41 · County 037, Alabama · Built 1977 · 2 Lanes · 398 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
011817
Year Built
1977
Length
29.3 m (96.1 ft)
Max Span
7.3 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
398
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$684,000
Total Project Cost
$752,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.