I - 459 SOUTH over AL - 3 (US 31)

I 459 * US 31 · County 073, Alabama · Built 1977 · 3 Lanes · 54,815 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
011743
Year Built
1977
Reconstructed
2002
Length
87.2 m (286.1 ft)
Max Span
36.6 m
Width
21.6 m (70.9 ft)
Lanes
3
Daily Traffic
54,815
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$4,655,000
Total Project Cost
$5,121,000