AL - 38 (US 280) over POPULAR SPRINGS

2.2 MI. E. CO RD 55 · County 117, Alabama · Built 1976 · 4 Lanes · 18,150 vehicles/day

Overall
Fair
Culvert
6
Satisfactory

Bridge Details

Structure #
011656
Year Built
1976
Length
8.5 m (27.9 ft)
Max Span
2.7 m
Lanes
4
Daily Traffic
18,150
Material
Concrete
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,386,000
Total Project Cost
$2,625,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.