CO.RD 60 over BUCK CREEK

WALKER POND · County 001, Alabama · Built 1976 · 2 Lanes · 135 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
011577
Year Built
1976
Length
23.2 m (76.1 ft)
Max Span
5.8 m
Width
7.9 m (25.9 ft)
Lanes
2
Daily Traffic
135
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$541,000
Total Project Cost
$595,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.