I-59 over TOMBIGBEE RIVER

SUMTER * GREEN CO LINE · County 119, Alabama · Built 1976 · 2 Lanes · 21,974 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011574
Year Built
1976
Length
629.4 m (2065 ft)
Max Span
114.3 m
Width
12 m (39.4 ft)
Lanes
2
Daily Traffic
21,974
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$16,832,000
Total Project Cost
$18,515,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.