19 TH ST over L*N RR

19 TH ST RELOC · County 073, Alabama · Built 1976 · 4 Lanes · 3,000 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
011553
Year Built
1976
Length
43.9 m (144 ft)
Max Span
15.5 m
Width
24.5 m (80.4 ft)
Lanes
4
Daily Traffic
3,000
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,947,000
Total Project Cost
$3,242,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.