US 80 EBL over DRY CREEK

3.1 MI. E. OF LOWNDESBORO · County 085, Alabama · Built 1975 · 2 Lanes · 4,085 vehicles/day

Overall
Fair
Culvert
5
Fair

Bridge Details

Structure #
011408
Year Built
1975
Length
13.1 m (43 ft)
Max Span
3 m
Lanes
2
Daily Traffic
4,085
Material
Concrete Continuous
Design
Culvert
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,089,000
Total Project Cost
$1,198,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.