US72; RAMP B over ROSEBERRY CREEK

RAMP FROM SR279 TO US 72E · County 071, Alabama · Built 1975 · 2 Lanes · 5,207 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
011391
Year Built
1975
Length
80.5 m (264.1 ft)
Max Span
30.5 m
Width
8.7 m (28.5 ft)
Lanes
2
Daily Traffic
5,207
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,739,000
Total Project Cost
$1,913,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.