CHEROKEE #4 over HURRICANE CREEK

0.2 MI N INT CHERO #10 · County 019, Alabama · Built 1974 · 2 Lanes · 165 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
7
Good
Substructure
6
Satisfactory

Bridge Details

Structure #
011185
Year Built
1974
Length
20.7 m (67.9 ft)
Max Span
10.4 m
Width
8.2 m (26.9 ft)
Lanes
2
Daily Traffic
165
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$507,000
Total Project Cost
$558,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.