I-59 over SUCARNOOCHEE RVR (-)

.8 MI. S. OF S.R.28 · County 119, Alabama · Built 1974 · 2 Lanes · 9,995 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 5 Fair
Substructure 6 Satisfactory

Location

32.615547, -88.213872

This bridge is in worse condition than 81.3% of bridges in County 119. The average bridge in Alabama is 0 years old; this one is 52 years old.

Nearby Bridges

Bridge Details

Structure #
011114
Year Built
1974
Length
286.9 m (941.3 ft)
Max Span
30.5 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
9,995
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$7,869,000
Total Project Cost
$8,656,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.