I-59 over RELIEF

3.9 MI.N.OF MISS.ST. LN. · County 119, Alabama · Built 1974 · 2 Lanes · 9,020 vehicles/day

Overall
Fair
Deck
7
Good
Superstructure
6
Satisfactory
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 7 Good
Superstructure 6 Satisfactory
Substructure 7 Good

Location

32.4831, -88.350994

This bridge is in worse condition than 65.4% of bridges in County 119. The average bridge in Alabama is 0 years old; this one is 52 years old.

Nearby Bridges

Bridge Details

Structure #
011100
Year Built
1974
Length
114 m (374 ft)
Max Span
10.4 m
Width
12.4 m (40.7 ft)
Lanes
2
Daily Traffic
9,020
Material
Concrete
Design
Tee Beam
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,367,000
Total Project Cost
$3,704,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.