I - 59 SOUTH over AVIATION AVE
AVIATION AVE · County 073, Alabama · Built 1974 · 3 Lanes · 38,900 vehicles/day
Overall
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
6
Satisfactory
Condition Ratings
| Component | Rating | Description |
|---|---|---|
| Deck | 6 | Satisfactory |
| Superstructure | 6 | Satisfactory |
| Substructure | 6 | Satisfactory |
Location
33.550461, -86.746203
This bridge is in worse condition than 35.5% of bridges in County 073. The average bridge in Alabama is 0 years old; this one is 52 years old.
Nearby Bridges
I - 59 NORTH over AVAITION AVE
Built 1974
I - 59 NORTH over 3RD AVE NO * 63RD ST
Built 1974
I - 59 SOUTH over 3 RD AVE N * 63 RD ST
Built 1974
I - 59 NORTH over 65 TH * 66 TH ST NO
Built 1976
63RD ST over BRANCH
Built 1989
I- 59 SOUTH over 65*66TH ST
Built 1976
RAMP D TO I59 over RAMP B TO I 20
Built 1974
I - 59 SB RAMP over RAMP B TO 1ST AVE NO
Built 1976
I - 59 SOUTH over I 20 RAMP A * B
Built 1974
I - 59 NORTH over I20 RAMP A*B
Built 1974
Bridge Details
- Structure #
- 011094
- Year Built
- 1974
- Length
- 64 m (210 ft)
- Max Span
- 23.8 m
- Width
- 16.5 m (54.1 ft)
- Lanes
- 3
- Daily Traffic
- 38,900
- Material
- Steel Continuous
- Design
- Stringer/Multi-beam or Girder
- Owner
- State Highway Agency
- Last Inspected
- N/A
- Est. Improvement
- $2,755,000
- Total Project Cost
- $3,031,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.