AL-18 over Sipsey River

0.5 MI E of Fayette · County 057, Alabama · Built 1973 · 2 Lanes · 2,953 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
7
Good

Bridge Details

Structure #
010951
Year Built
1973
Length
193.1 m (633.5 ft)
Max Span
30.5 m
Width
14.6 m (47.9 ft)
Lanes
2
Daily Traffic
2,953
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$6,413,000
Total Project Cost
$7,054,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.