US 72; SR 2 over HURRICANE CREEK RELIEF

3.2 MI E FLINT RIVER · County 089, Alabama · Built 1973 · 2 Lanes · 9,946 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
010920
Year Built
1973
Length
36.3 m (119.1 ft)
Max Span
15.5 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
9,946
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$1,340,000
Total Project Cost
$1,474,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.