US 431 MP 41.540 over SEABOARD RR(ABANDONED)

2 MI. N JCT. SR 27 · County 067, Alabama · Built 1973 · 2 Lanes · 3,885 vehicles/day

Overall
Good
Deck
7
Good
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
010914
Year Built
1973
Length
65.2 m (213.9 ft)
Max Span
21.9 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
3,885
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,178,000
Total Project Cost
$2,396,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.