MERIWETHER TRAIL over BLUE CREEK

.2 MI E LAPINE FLASHER · County 101, Alabama · Built 1994 · 2 Lanes · 600 vehicles/day

Overall
Good
Deck
8
Very Good
Superstructure
8
Very Good
Substructure
8
Very Good

Bridge Details

Structure #
010738
Year Built
1994
Length
31.1 m (102 ft)
Max Span
10.4 m
Width
9.4 m (30.8 ft)
Lanes
2
Daily Traffic
600
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$815,000
Total Project Cost
$897,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.