RAMP F over 26 TH ST

RAMP F TO 2ND AVE NORTH · County 073, Alabama · Built 1972 · 1 Lanes · 31,810 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
010737
Year Built
1972
Length
89.6 m (294 ft)
Max Span
40.8 m
Width
11.9 m (39 ft)
Lanes
1
Daily Traffic
31,810
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$2,656,000
Total Project Cost
$2,922,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.