I65 SBL over AL RIVER RELIEF NO.11

0.2 MI N OF MONTG CO · County 051, Alabama · Built 1972 · 6 Lanes · 35,045 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
5
Fair
Substructure
6
Satisfactory

Bridge Details

Structure #
010677
Year Built
1972
Length
487.1 m (1598.1 ft)
Max Span
30.8 m
Width
38.3 m (125.7 ft)
Lanes
6
Daily Traffic
35,045
Material
Steel
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$41,750,000
Total Project Cost
$45,925,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.