CO RT 385 over BRANCH

CR 385 · County 043, Alabama · Built 1971 · 2 Lanes · 400 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Condition Ratings

ComponentRatingDescription
Deck 6 Satisfactory
Superstructure 7 Good
Substructure 7 Good

Location

34.081567, -86.943203

This bridge is in worse condition than 50.8% of bridges in County 043. The average bridge in Alabama is 0 years old; this one is 55 years old.

Nearby Bridges

Bridge Details

Structure #
010553
Year Built
1971
Length
7.3 m (24 ft)
Max Span
7.3 m
Width
7.8 m (25.6 ft)
Lanes
2
Daily Traffic
400
Material
Concrete
Design
Channel Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$236,000
Total Project Cost
$260,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.