CO. HWY. 365 over DRY BROOK

0.15 MI. SO.CR 365 · County 117, Alabama · Built 1970 · 1 Lanes · 75 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
6
Satisfactory
Substructure
5
Fair

Bridge Details

Structure #
010438
Year Built
1970
Length
8.2 m (26.9 ft)
Max Span
2.4 m
Width
3.9 m (12.8 ft)
Lanes
1
Daily Traffic
75
Material
Concrete Continuous
Design
Slab
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$122,000
Total Project Cost
$134,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.