CR # 65 over VALLEY CREEK

0.25 MI W SR 22 N · County 047, Alabama · Built 1960 · 2 Lanes · 1,375 vehicles/day

Overall
Fair
Deck
6
Satisfactory
Superstructure
7
Good
Substructure
7
Good

Bridge Details

Structure #
010373
Year Built
1960
Length
81.5 m (267.4 ft)
Max Span
15.2 m
Width
7.1 m (23.3 ft)
Lanes
2
Daily Traffic
1,375
Material
Concrete Continuous
Design
Tee Beam
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$1,443,000
Total Project Cost
$1,587,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.