AL 41 over ALABAMA RIVER

1.0 MI.N.OF US 80 · County 047, Alabama · Built 1970 · 2 Lanes · 10,540 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
010340
Year Built
1970
Length
461.5 m (1514.1 ft)
Max Span
67.1 m
Width
13 m (42.7 ft)
Lanes
2
Daily Traffic
10,540
Material
Steel Continuous
Design
Girder and Floorbeam System
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$13,291,000
Total Project Cost
$14,620,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.