I-65 SB over RAMP 2 * NORF SO RR

0.2 MI N E US 43 · County 097, Alabama · Built 1970 · 2 Lanes · 1,145 vehicles/day

Overall
Fair
Deck
5
Fair
Superstructure
6
Satisfactory
Substructure
6
Satisfactory

Bridge Details

Structure #
010200
Year Built
1970
Length
103.6 m (339.9 ft)
Max Span
31.4 m
Width
13.1 m (43 ft)
Lanes
2
Daily Traffic
1,145
Material
Steel Continuous
Design
Stringer/Multi-beam or Girder
Owner
State Highway Agency
Last Inspected
N/A
Est. Improvement
$3,326,000
Total Project Cost
$3,659,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.