COUNTY ROAD 5522 over BEAVER POND BRANCH

SEC 17 T9N R22E · County 109, Alabama · Built 1969 · 2 Lanes · 150 vehicles/day

Overall
Good
Culvert
7
Good

Bridge Details

Structure #
010059
Year Built
1969
Length
8.1 m (26.6 ft)
Max Span
2.4 m
Width
11.6 m (38.1 ft)
Lanes
2
Daily Traffic
150
Material
Concrete
Design
Culvert
Owner
County Highway Agency
Last Inspected
N/A
Est. Improvement
$221,000
Total Project Cost
$243,000
Data from FHWA National Bridge Inventory. Bridge conditions may have changed since the last inspection. This site is not affiliated with FHWA. Do not use for route clearance purposes.